Carrying the Machine to the Installation Site and Removing the Packing Materials

1.
See the included "READ THIS SHEET FIRST!" before carrying the machine to the installation site.
2.
Remove all shipping tape from the flap side edges.
3.
Open the feeder, remove the protective sheet, and take out the drum unit.
0CJ7-009