Managing Inspection Jobs

This section describes how to manage inspection jobs that have already been created.
NOTE
Inspection jobs are managed not by name but by creation time. If you have multiple inspection jobs with the same name, you can distinguish them by creation time and the content of the inspection job.

Viewing Inspection Settings

For inspection jobs before inspection:

1.
Select the inspection job for which you want to view the settings from the main screen
2.
Display the [Inspection Settings] screen using any of the following methods
Click [Inspection Settings] from [File] in the menu bar.
Click [Inspection Settings] in the toolbar.
Right-click the selected inspection job and click [Inspection Settings].
The [Inspection Settings] screen is displayed.
3.
Check the master images and settings
If you need to make changes, change the settings by referring to the following.
4.
To not change the settings, click [Cancel]
The [Inspection Settings] screen closes.

For finished inspection jobs:

1.
Select the inspection job for which you want to view the settings from the main screen
2.
Display the [Confirm Inspection Settings] screen using any of the following methods
Click [Confirm Inspection Settings] from [Inspection] in the menu bar.
Click [Confirm settings] in the [Settings] field for the selected inspection job.
Right-click the selected inspection job and click [Confirm Inspection Settings].
The [Confirm Inspection Settings] screen is displayed.
3.
Check the master images and settings
4.
Click [Close]
The [Confirm Inspection Settings] screen closes.

Using an Existing Inspection Job to Create a New Inspection Job

1.
Open the main screen
2.
Select the inspection job you want to duplicate
3.
Duplicate the inspection job by using any of the following methods
Click [Duplicate] from [File] in the menu bar.
Click [Duplicate] in the toolbar.
Right-click the selected inspection job and click [Duplicate].
The inspection job is duplicated with a name that has "-Copy" added to the end of the inspection job name.
4.
Change the name of the inspection job as needed
5.
Display the [Inspection Settings] screen using any of the following methods
Click [Inspection Settings] from [File] in the menu bar.
Click [Inspection Settings] in the toolbar.
Right-click the selected inspection job and click [Inspection Settings].
6.
Change the master images and setting values

Changing the Name of an Inspection Job

1.
Open the main screen
2.
Select the inspection job for which you want to change the name
3.
Make the name editable by using any of the following methods, and then input the new name
Click [Change Name] from [File] in the menu bar.
Right-click the selected inspection job and click [Change Name].
Double-click the selected inspection job.
The name of the inspection job is changed.

Deleting an Inspection Job

1.
Open the main screen
2.
Select the inspection job you want to delete
3.
Delete the inspection job by using any of the following methods
Click [Delete] from [File] in the menu bar.
Right-click the selected inspection job and click [Delete].
Click ([Delete]) for the selected inspection job.
4.
When the confirmation screen is displayed, check the details and click [Yes]
The inspection job is deleted.

Sorting Inspection Jobs

You can sort the inspection jobs in ascending/descending order by clicking the item names of each column in the list.

Searching Inspection Jobs

Enter a string into the search box to display a list of only the inspection jobs that contain the input string.
Fields other than [Name] are also searched.
The part matching the string that was entered into the search box is highlighted.

Outputting an Inspection Results Report

You can tally the inspection results of multiple inspection jobs and output them to a single CSV file.
The details that are given in the report are as follows. The bottom row contains an output of the total of the items marked with an asterisk (*).
[Name]
[Inspection Started]
[Inspection Ended]
[Number of Inspected Sheets]*
[Number of Good Sheets]*
[Number of Defective Sheets]*
[Percent Defective]*
1.
Open the main screen
2.
Select the inspection job for which you want to output the report
3.
Output the report by using any of the following methods
Click [Inspection Results Report] from [Inspection] in the menu bar.
Right-click the selected finished inspection job and click [Inspection Results Report].
4.
When the confirmation screen is displayed, check the details and click [OK]
5.
When the save file screen is displayed, go to the save destination folder, input the file name, and then click [Save]
The inspection results report is output.

Exporting Inspection Jobs

You can export information such as the inspection settings and inspection results of an inspection job to a file.
1.
Open the main screen
2.
Select the inspection job you want to export
You can also select multiple inspection jobs.
3.
Export the inspection jobs by using any of the following methods
Click [Export] from [File] in the menu bar.
Right-click the selected inspection job and click [Export].
4.
When the confirmation screen is displayed, check the details and click [OK]
5.
When the save file screen is displayed, go to the save destination folder, input the file name, and click [Save]
The process starts.
NOTE
The file extension of the inspection job file is "jbk".
Information on all of the selected inspection jobs is output to a single file.
6.
When the processing complete confirmation screen is displayed, check the details and click [OK]
The file is saved.

Importing Inspection Jobs

1.
Open the main screen
2.
Click [Import] from [File] in the menu bar
3.
When the confirmation screen is displayed, check the details and click [OK]
4.
When the file selection screen is displayed, select the inspection job file (.jbk) you want to import and click [Open]
The process starts.
IMPORTANT
If an inspection job exists in the list on the main screen with the same creation date and time as the inspection job being imported, the inspection job in the list is overwritten with the inspection job being imported. Since the comparison is performed on the creation date and time instead of the update date and time, if the inspection job settings are changed after export, it will be overwritten with the old information.
Even if the names of the inspection jobs are the same, if the creation date and time are different, the job is imported as a separate inspection job.
All of the inspection jobs contained in the inspection job file are imported.
5.
When the processing complete confirmation screen is displayed, check the details and click [OK]
The imported inspection jobs are added to the list.